Excess inventory, production delays and chaos on the floor are often caused by inefficient intralogistics.
This episode covers two Lean systems that streamline material flow: Milk Run, a planned internal delivery route that supplies multiple points, and Kanban, a signal-based system that orders material only when it is needed.
In this episode, you’ll discover
- How to test route frequencies and container sizes in simulation without interrupting production
- Why real-time data is key to optimising delivery routes and Kanban inventory levels
- How DBR77 models intralogistics digitally and synchronises logistics with actual production needs
Want to see how this works in your plant? Book a free session with a DBR77 expert: Book a meeting
Listen to Factory on Air on Spotify or watch all episodes on YouTube.



