Digital Twin
Build virtual replicas of your production facilities. Test layouts, simulate flows, and validate CAPEX decisions — before investing a single euro.
Book a DemoSimulate Before You Invest
Digital Twin by DBR77 creates fully parametric virtual models of your manufacturing plant — layouts, process flows, material handling, and workforce. Run “what-if” scenarios in hours, not months.
Avoid costly mistakes: our clients have saved up to €7M by identifying the real bottleneck before committing to CAPEX.
Identify Real Bottlenecks
Stop investing in the wrong areas. Digital Twin uses discrete-event simulation with stochastic deviation models derived from your historical data — not ideal-world assumptions.
The platform ranks constraints by actual utilization, queue lengths, and wait times, giving you an objective, data-driven view that every department can agree on.
From Layout to ROI in One Platform
Import CAD floor plans, map process routes, integrate ERP/MES/IoT data, and build your as-is model. Then create to-be scenarios: new lines, automation, layout changes, staffing adjustments.
Every scenario comes with a financial overlay — NPV, payback period, ROI — ready for the investment committee.
Use Cases
Greenfield & Expansion
Design new facilities or major expansions in 3D. Test material flows in motion and validate CAPEX before breaking ground.
Layout Relocation
Plan relocation sequences that maintain production continuity. Validate buffers, transport paths, and minimize downtime.
Intralogistics Optimization
Optimize Milkrun routes, Kanban replenishment, and buffer sizing. Simulate with real-world deviations — scrap, delays, absenteeism.
Warehouse Throughput
Simulate warehouse operations, identify bottlenecks, validate staffing levels. Optimize slotting and pick paths.
Line Balancing
Simulate operator assignments with variability and absenteeism. Find the staffing configuration that maximizes throughput.
Virtual Showroom
For equipment suppliers: interactive 3D demos, VR/AR product presentations, and remote walkthroughs that close deals faster.
Proven Results
€7M Saved in CAPEX
A plant planned a €10M new line for 20% more throughput. Digital Twin revealed the real bottleneck was internal logistics. A €3M targeted investment delivered the same capacity gain.
OEE from 65% to 78%
Digital Twin analyzed failures, micro-stoppages, changeovers, and material logistics — then simulated shift reorganization and buffer redesign. No major CAPEX required.
Analysis Time: Weeks → Days
CAPEX feasibility studies that took 3–6 months are now completed in 4–8 weeks with more scenario variants evaluated.
€15M Investment Avoided
Digital Twin proved that a planned hall expansion wouldn’t deliver proportional benefits. A €2M reorganization achieved the same output on existing floor space.
Frequently Asked Questions
How quickly will we see results from Digital Twin?
Can Digital Twin model our specific processes, layout, and resources?
How reliable are the simulation results for multi-million investment decisions?
What integrations are supported?
Can we start small and scale later?
How does Digital Twin protect our intellectual property?
Is Digital Twin compatible with Lean/Kaizen methodology?
What does the ROI typically look like?
See Your Plant in Digital
Book a personalized walkthrough and discover how Digital Twin can de-risk your next CAPEX decision.
Schedule a Demo